*** CFD Summary File Output *** CFD 2021 (2021) [20201120] Job Name = Scenario 1 Date created: Sat Dec 18 12:06:17 2021 *** Analysis Information Steady State is ON Turbulent Incompressible Flow is ON2 *** Field Variable Results Summary For Iteration 862 Var Mean at Max at Min Vx Vel -6.68179e+00 58778 +2.92759e+03 58811 -3.06747e+03 cm/s Vy Vel -1.66571e+03 59620 +2.39152e+03 92421 -8.28702e+03 cm/s Vz Vel +1.19735e+01 58978 +3.05975e+03 58612 -3.10919e+03 cm/s Press -2.19942e+03 13956 +3.33708e+04 9522 -2.53373e+04 dyne/cm^2 Temp +0.00000e+00 2642 +0.00000e+00 9561 +0.00000e+00 C TurbK +4.03008e+05 67530 +3.18116e+09 9607 +1.81700e-07 cm^2/s^2 TurbD +2.99770e+11 67530 +3.90406e+15 2424 +7.61610e-03 cm^2/s^3 Scal1 +0.00000e+00 2642 +0.00000e+00 9561 +0.00000e+00 PTotl +3.55959e+03 47455 +4.18228e+04 9522 -2.53373e+04 dyne/cm^2 EVisc +6.03504e-02 95336 +1.81700e+02 38032 +0.00000e+00 g/cm-s ECond +5.98380e-02 95336 +2.56300e+02 38032 +0.00000e+00 W/cm-K Dens +1.96231e-01 38032 +1.05000e+00 9561 +1.20473e-03 g/cm^3 Visc +1.47912e-04 2642 +1.81700e-04 38032 +0.00000e+00 g/cm-s Cond +4.93148e-04 38032 +1.53000e-03 9561 +2.56300e-04 W/cm-K SpecH +1.19851e+00 38032 +2.05000e+00 9561 +1.00400e+00 J/g-K Emiss +8.14047e-01 2642 +1.00000e+00 38032 +0.00000e+00 Transmiss +0.00000e+00 0 +0.00000e+00 0 +0.00000e+00 WRough +0.00000e+00 2642 +0.00000e+00 9561 +0.00000e+00 cm SeeBeck +0.00000e+00 0 +0.00000e+00 0 +0.00000e+00 V/K SHGC +0.00000e+00 0 +0.00000e+00 0 +0.00000e+00 Ufactor +0.00000e+00 0 +0.00000e+00 0 +0.00000e+00 GenT +1.31028e+05 769 +1.53887e+08 38032 +3.16228e-02 1/s *** Openings *** *** Inlet 1 *** Surface ID = 4108 Node near Minimum X,Y,Z of opening = 15236 Minimum X,Y,Z of opening = -41.743328, 150.000000, -41.593714 Mass Flow In = 107723 g/s Volume Flow In = 8.94164e+07 cm^3/s Reynolds Number = 5.38966e+06 Inlet Bulk Pressure = 1738.68 dyne/cm^2 Inlet Bulk Temperature = 0 C Inlet Mach Number = 0.208748 Total Mass Flow In = 107723 g/s Total Vol. Flow In = 8.94164e+07 cm^3/s *** Outlet 1 *** Surface ID = 4106 Node near Minimum X,Y,Z of opening = 14886 Minimum X,Y,Z of opening = 13.737453, -180.000000, 35.597559 Mass Flow Out = -107711 g/s Volume Flow Out = -8.94067e+07 cm^3/s Reynolds Number = 5.38907e+06 Outlet Bulk Pressure = -0 dyne/cm^2 Outlet Bulk Temperature = -0 C Outlet Mach Number = 0.201233 Total Mass Flow Out = -107711 g/s Total Vol. Flow Out = -8.94067e+07 cm^3/s *** Statistics for Velocity Magnitude *** Value Range [cm/s] Percent Volume 0.000000 - 414.414479 1.418440 414.414479 - 828.828958 0.002148 828.828958 - 1243.243437 0.001570 1243.243437 - 1657.657916 0.003580 1657.657916 - 2072.072395 0.004800 2072.072395 - 2486.486874 0.004161 2486.486874 - 2900.901353 0.003506 2900.901353 - 3315.315832 0.002956 3315.315832 - 3729.730311 0.003658 3729.730311 - 4144.144790 0.009035 4144.144790 - 4558.559269 0.011086 4558.559269 - 4972.973748 0.008417 4972.973748 - 5387.388227 0.021126 5387.388227 - 5801.802706 0.122975 5801.802706 - 6216.217185 0.121534 6216.217185 - 6630.631664 1.655804 6630.631664 - 7045.046143 2.474372 7045.046143 - 7459.460622 17.965028 7459.460622 - 7873.875101 76.156120 7873.875101 - 8288.289580 0.009684 Mean Value = 1413.019515 , Standard Deviation = 2623.946129 *** Sum of Fluid Forces on Walls *** ShearX, PressX = 1784.4 -14404 dynes ShearY, PressY = -1.6279e+07 -9.2383e+05 dynes ShearZ, PressZ = -410.61 1.2754e+05 dynes *** Analysis Statistics: Input: 9 seconds Analysis: 332 seconds Output: 2 seconds Total: 343 seconds Headnode process dynamic memory 310 Mbytes Computenode process 0 dynamic memory 96 Mbytes Computenode process 1 dynamic memory 119 Mbytes Computenode process 2 dynamic memory 106 Mbytes Computenode process 3 dynamic memory 122 Mbytes